Phase 1: Rough Clean (Post-Framing & Drywall)
Once structural framing, drywall sanding, and heavy contractor work are completed, our crew clears out leftover construction clutter. We remove protective cardboard, plastic sheeting, tape, and loose debris, followed by an initial HEPA vacuuming of subfloors, window frames, and closets before final fixtures and flooring are installed.
Phase 2: Deep Detail Clean (Interior & Exterior)
Performed after painting, cabinetry, tiling, and plumbing fixtures are finalized, our deep detail clean covers every surface from ceiling to floor:
• Windows, Glass & Tracks: Safe removal of manufacturer stickers, protective film glue, paint specks, stucco dust, and silicone smears from interior and exterior glass, screens, sills, and sliding tracks.
• Walls, Ceilings & Trim: Gentle dry-dusting and damp-wiping of baseboards, crown molding, interior doors, light switches, outlets, pot lights, and air vents.
• Kitchens & Custom Millwork: Deep vacuuming and wiping inside and outside all cabinets, drawers, pantries, backsplashes, quartz countertops, sinks, and stainless steel appliances.
• Bathrooms & Tilework: Sanitizing tubs, frameless glass shower enclosures, mirrors, vanities, exhaust fans, and scrubbing light grout haze from porcelain and stone tiles.
• Floors & Staircases: Commercial HEPA vacuuming and streak-free damp mopping of hardwood, engineered wood, luxury vinyl, and natural stone flooring.
Phase 3: Final White-Glove Touch-Up
Because fine drywall dust can take 24 to 48 hours to settle out of the air, we offer a final pre-move-in walkthrough—polishing glass, wiping horizontal surfaces, and ensuring zero dust remains before furniture arrives or clients walk through the door.Need complete exterior cleanup after your renovation? Pair your post-construction cleaning with our professional window cleaning, eavestrough cleaning, and power washing services in Toronto.